
GENERAL INFORMATION RE: PREPERATION FOR WOOD FLOORS1. Hardwood flooring should be one of the last things installed. All work that 2. Overall landscaping to be checked to ensure that proper drainage is provided. 3. Moisture meter testing must be done. 4. A "DRY" slab as defined by a moisture meter, can be "WET" at other times of 5. Building interiors are affected by two distinct humidity seasons - Heating and 6. Heating Season (DRY) Humidifier is recomended to prevent excessive shrinkage 7. Non-Heating Season: (Humid, Wet) Proper humidity levels can be maintained by 8. Temperature: The job site should have a consistant room temperature of 60 - 70 9. Floors should not be used for at least 24 hours, after install, and in particular, no |